Projects with Bids Invited


 

Status of Port Connectivity Projects

S. no.

State

Project Stretch

Name of Port/ IWT Terminal Connected

Length (km)

Total Capital Cost (INR Cr.)

Mode of Implementation (Tentative)

Total Fund required (100% of TPC for EPC projects and 40% of TPC for HAM projects)

Status

1

Karnataka

Road connectivity from Kasarkad side of Honnavar Port to NH

Honnavar

4

137

EPC

137

IAC apprised the project in NHAI, approval pending with Ministry dt 31.05.21.

2

Andhra Pradesh

Anchorage Old Port Kakinada to Achampeta Junction

Kakinada Port

13.195

160.41

EPC

160.41

IAC apprised the project in NHAI, approval pending with Ministry dt 25.05.21.

3

Andhra Pradesh

Port connectivty road (four lane) from East Break Water to Convent Junction

Vishakhapatnam

3.958

93.41

EPC

93.41

IAC already apprised the Phase-I (3km). It has been decided now to include Phase-II. Proposal is under preparation.

4

 

 

Total

21